Former Clayton Works,Ty'n Y Bonau Road,

Pontarddulais, SA4 8RU

Caredig intend to apply for planning permission for the erection of 30 residential units, access works, car parking, landscaping and associated works on vacant land at Ty'n Y Bonau Road, Pontarddulais.

The location on the website map is indicative of the registered postcode area for the development site. The exact location of the site can be viewed in the draft application plans.

1. Read about the proposal

The proposal seeks to erect 30 residential units, access works, car parking, landscaping and associated works on vacant land at the former Clayton Works, Ty'n Y Bonau Road, Pontarddulais, SA4 8RU.

 

Caredig intends to submit a planning application for the redevelopment of vacant land west of Ty’n y Bonau Road in Pontarddulais for a total of 30 dwellings, comprising 16 flats and 14 dwellings including one adapted bungalow, together with open space and landscaping.

The scheme has been designed to make best use of this brownfield site, while maintaining appropriate separation distances from existing properties.  The development will retain key perimeter landscaping and provide new planting where appropriate. Cycle, pedestrian and vehicle access will be taken via the existing junction onto Ty’n y Bonau Road.

2. View the draft application

Please click on the documents below to view the draft application submission.

  • Ty'n Y Bonau Draft Application Forms

    Download

  • Ty'n Y Bonau Design and Access Statement - Final

    Download

  • Ty'n Y Bonau Drawings - Site Layout-Plans-Elevations

    Download

  • Ty'n Y Bonau Existing Site Plan Topographical Survey

    Download

  • Ty'n Y Bonau Preliminary Ecological Appraisal

    Download

  • Ty'n Y Bonau Tree Survey & APPENDIX

    Download

  • Ty'n Y Bonau Site Investigation Report Part1

    Download

  • Ty'n y Bonau Site Investigation Report Part2

    Download

  • Ty'n Y Bonau Site Investigation Report Part3

    Download

  • Ty'n Y Bonau Site Investigation Report Part4

    Download

  • Ty'n Y Bonau Site Investigation Report Part5

    Download

  • Ty'n Y Bonau Site Investigation Report Part6.pdf

    Download

  • Ty'n y Bonau Drainage Strategy and Flood Risk

    Download

  • Ty'n Y Bonau APPENDIX A to Drainage Strategy

    Download

  • Ty'n Y Bonau APPENDIX B & B1 to Drainage Strategy

    Download

  • Ty'n Y Bonau APPENDIX C to Drainage Strategy Part1

    Download

  • Ty'n Y Bonau APPENDIX C to Drainage Strategy Part2

    Download

  • Ty'n Y Bonau APPENDIX C to Drainage Strategy Part3

    Download

  • Ty'n Y Bonau APPENDIX C to Drainage Strategy Part4

    Download

  • Ty'n Y Bonau APPENDIX C to Drainage Strategy Part5

    Download

  • Ty'n Y Bonau APPENDIX C to Drainage Strategy Part6

    Download

  • Ty'n Y Bonau Proposed SUDS Plan

    Download

  • Ty'n Y Bonau Refuse Vehicle Tracking Plan

    Download

  • Ty'n Y Bonau Utilities Search

    Download

  • Ty'n Y Bonau Landscape Strategy

    Download

  • Tyn Y Bonau Road Transport Statement

    Download

  • Ty'n Y Bonau Preliminary Transport Plan - proposed site access

    Download

3. Have your say

roundel

Ty'n Y Bonau Road, Pontarddulais